Exercise Caution in the Presence of Wildlife

Remember that some of our parks' creatures warrant extra caution if encountered.

Design Your New Playground at Flood Park, March 16

Join us Saturday, March 16, 2–4pm, to share ideas for a new playground at Flood Park. Plus, the Board of Supervisors, have approved the plans and specifications for Phase 1 of the Flood Park Landscape Plan and selection of a contractor.

Reserve Memorial Park Sites for Camping with Dogs by Phone

Huckleberry Flat, a camping area for dogs and their owners at Memorial Park, are reserved by phone only. Visitors are required to bring a dog when staying in this area.

Bids for Flood Park Phase 1 Construction Now Closed

The bid period for Phase 1 construction of the Realize Flood Park project is now closed. Selection of contractor and construction timeline will be announced in March 2024.

Use Caution on Beaches and Bluffs

Wet weather can cause bluffs to become unstable. Visitors should remain clear of the bluff edge and should not walk on the beach directly below bluffs.

Fitzgerald Marine Reserve Bridge Now Open

The bridge over San Vicente Creek in Fitzgerald Marine Reserve is now open. The new bridge replaces the one previously damaged in the 2023 winter storms.

Construction of Tunitas Creek Beach Underway

The transformation of the 58-acre Tunitas Creek Beach property into San Mateo County’s newest park is in progress. Construction crews are working on the mid-bluff area and the access trail to the beach. The pink house has been demolished and natural material was cleared followed by rough grading. This is where most visitor services will be located, including seating, an overlook to the beach and southern bluffs, a picnic sites, interpretive panels, public restrooms, and staff facilities. Construction is anticipated to begin this spring.

Senator Josh Becker Announces Funds for Ohlone-Portolá Heritage Trail Signage

On Dec. 7, 2023 Senator Josh Becker presented a symbolic check for $500,000 to San Mateo County leaders to fund a series of historic monument sites that will be installed along the 90-mile Ohlone-Portolá Heritage Trail.

Follow-up Eucayptus Removal on Northwest of San Bruno Mountain Park, Dec 4–6

From Monday through Wednesday, December 4–6, weather permitting, San Mateo Parks and contractors will work to control regrowth of invasive Eucalyptus across two acres on the northwest boundary of San Bruno Mountain Park, near properties along Florence St. and Mountain View Dr.

Call for Bids Posted for Realize Flood Park Phase 1 Construction

The Realize Flood Park Phase 1 project is out for rebid with plans and specifications and key dates posted at San Mateo County Public Works.

A New Tool to Reduce Fire Fuel in Memorial & Pescadero Creek Parks

In coordination with CAL FIRE and the Bay Area Air Quality Management District, we'll use an air curtain burner to dispose of logs and other woody debris left over from past projects and storm-downed trees.

Pump Track Opens at Flood Park, Oct 21

On Saturday, October 21, the new pump track opens at Flood Park. Completion of the pump track is part of the first phase of construction for Realize Flood Park, a community-informed project focused on redesigning and revitalizing Flood Park.